installation in free air without UV-protection (cable UV-resistant) cable conform to Low Voltage directive max. permitted temperature at conductor 90 °C cable for reeling application monospiral reeling multispiral drum vertical drum min. installation temperature -30 °C
p/nr.Part nameAvailabilityPackagingEUR netto pre-metal per 1.000 m.
0523713X35 + 2X25/2 + 24 FO (9/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

Presentation

Log in to see prices

New here? Register now
Price
0539663X25 + 2X25/2 + 24 FO (9/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0539673X25 + 2X25/2 + 24 FO (50/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0539683X25 + 2X25/2 + 24 FO (62.5/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0534293X35 + 2X25/2 + 12 FO (50/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538443X120 + 2X70/2 + 24 FO (9/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538453X120 + 2X70/2 + 24 FO (50/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538463X120 + 2X70/2 + 24 FO (62.5/125) 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0534273X95 + 2X50/2 + (5X2.5)C + 24G62.5/125 3.6/6 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0525893X25 + 2X25/2 + 24 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0520643X25 + 2X25/2 + 24 FO (62.5/125) 6/10 kV RD
in stock
PresentationPrice
0522173X25 + 2X25/2 + 12 FO9/125 + 12G62.5/125 6/10 kV RD
in stock
PresentationPrice
0522163X35 + 2X25/2 + 12 FO9/125 + 12G62.5/125 6/10 kV RD
in stock
PresentationPrice
0534303X35 + 2X25/2 + 12 FO (50/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0533413X50 + 2X25/2 + 24 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0522113X70 + 2X35/2 + 12 FO9/125 + 12G62.5/125 6/10 kV RD
in stock
PresentationPrice
0533433X50 + 3X50/3 + (18X2.5)C + 24 FO9/125 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0531763X35 + 3X35/3 + (18X2.5)C + 24 FO9/125 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0530653X25 + 2X25/2 + 24 FO (9/125) 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0541063X25 + 2X25/2 + 24 FO (50/125) 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0527833X25 + 2X25/2 + 24 FO (62.5/125) 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0530313X35 + 2X25/2 + 12 FO9/125 + 12G62.5/125 8.7/15 kV RD
in stock
PresentationPrice
0522133X35 + 2X25/2 + 12 FO9/125 + 12G62.5/125 8.7/15 kV RD
in stock
PresentationPrice
0534233X35 + 2X25/2 + 24 FO (9/125) 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0534423X35 + 3X25/3 + (18X2.5)C + 24 FO9/125 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0546343X50 + 2X25/2 + 24 FO 62.5/125 8.7/15 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. week

PresentationPrice
0522153X70 + 2X35/2 + 12 FO9/125 + 12G62.5/125 8.7/15 kV RD
in stock
PresentationPrice
0524703X25 + 2X25/2 + 12 FO9/125 + 12G62.5/125 12/20 kV RD
in stock
PresentationPrice
0522253X95 + 2X50/2 + 24 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0532043X95 + 2X50/2 + 24 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0535153X95 + 50 + 3X(2X2.5)C + 24G62.5/125 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540473X95 + 50 + 3X(4X2.5)C + 24 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540483X95 + 50 + 3X(4X2.5)C + 24 FO (50/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540493X95 + 50 + 3X(4X2.5)C + 24 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540303X120 + 2X70/2 + 12 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540313X120 + 2X70/2 + 12 FO (50/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0540323X120 + 2X70/2 + 12 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0537463X120 + 2X70/2 + 24 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0537473X120 + 2X70/2 + 24 FO (50/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0537483X120 + 2X70/2 + 24 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538483X185 + 2X95/2 + 24 FO (9/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538493X185 + 2X95/2 + 24 FO (50/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0538503X185 + 2X95/2 + 24 FO (62.5/125) 6/10 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0527993X25 + 2X25/2 + 24 FO 9/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0532523X35 + 2X25/2 + 24G50/125 12/20 kV RD
in stock
PresentationPrice
0524513X25 + 2X25/2 + 24 FO 62.5/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0525463X35 + 2X25/2 + 12 FO 62.5/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0539543X35 + 2X25/2 + 12 FO9/125 + 12G62.5/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0525413X35 + 2X25/2 + 24G62.5/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0528163X35 + 2X25/2 + 24G62.5/125 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. 34 weeks

PresentationPrice
0546223X50 + 2X25/2 + 24 FO (9/125) 12/20 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. week

PresentationPrice
0545443X25 + 2X25/2 + 24 FO 9/125 14/25 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. week

PresentationPrice
0545453X25 + 2X25/2 + 24 FO 50/125 14/25 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. week

PresentationPrice
0545463X25 + 2X25/2 + 24 FO 62.5/125 14/25 kV RD
MOQ

MOQ: 500 m

Delivery time: approx. week

PresentationPrice
Customs Tariff Number (code number) 85446010900000000
Standard DIN VDE 0250-813 (with ref. to)
Conductor material tinned copper
Conductor construction Class 5 = flexible
Insulation HEPR
Electrical field control inner and outer semiconducting rubber layer
Arrangement of protective conductors split in the outer interstices
Material inner sheath rubber GM1b
Torsion protection polyester braid
Sheathing material rubber (CR) 5GM5
Colour of outer sheath red
Max. temperature at conductor, °C 90 °C
Permitted outer cable temperature, fixed, °C -40 - +80 °C
Permitted outer cable temperature, moved, °C -30 - +80 °C
Bending radius, fixed installation 6 x Ø
Bending radius, moving application 12 x Ø
Operating speed monospiral (two ways), m/min. 200 m/min.
Operating speed random, m/min. 60 m/min.
Operating speed monospiral (one way), m/min. 300 m/min.
operating speed spreader, m/min. 200 m/min.
Operating speed tender system, m/min. 60 m/min.
metal base Cu 150 EUR/100 kg
Unit of measurement metre
crane cables / hoist cables yes

Medium voltage reeling cable for high speed, high pull and torsion resistance. As main application for us in monospiral drums and spreader application. The cables can be manufactured to order or project-specific with E9/125, 50/125 or 62.5/125 fibres or their various combinations.

All images shown here are for illustrations and product reference purposes only.

Freight cost extra. Prices plus metal regarding the daily market price.

Contact
Cable calculator